NO | Company | Services | From | To | Description |
01 | Petrosilah | Hiring on shore work over rig | 17/07/2016 | 16/07/2018 | Backup Contract |
02 | Abu Qir | Coiled Tubing & Nitrogen Services | 27/10/2016 | 22/08/2019 | Providing Abu Qir Petroleum Company with coiled tubing, Nitrogen lifting & Acid Services |
03 | Al Amal | Hydraulic Hammering Services | 22/07/2017 | To Time | Providing Amal Petroleum Company with Hydraulic Hammering services |
04 | Petrosilah | Coiled Tubing & Nitrogen Stimulation services | 19/06/2017 | 19/12//2019 | Providing Petrosilah petroleum company with Coiled Tubing & Nitrogen Stimulation services |
05 | GEMSA | Hydraulic Hammering Services | 01/08/2018 | To Time | Farm-In from Amal petroleum company contract for Hydraulic Hammering Services |
06 | AlWastani | The Electric Multi Caliper Logging, Thru TBG & CSG Perforation | 21/01/22019 | To Time | Providing Alwastani with the required services |
07 | AMAPETCO | Tubular running and pulling services | 28/05/2019 | TO Time | Providing AMAPETCO Petroleum Company as main contractor by running services and as backup contractor for casing services |
08 | Petrobel | Inquiry for pulling unit with 50 HP min. capacity for sucker rod wells work-over | 20/06/2019 | To Time | Providing Petrobel with pulling unit with 50 HP min. capacity for sucker rod wells work-over |
09 | PetroGulf Misr | Conductor Driving Services | 20/07/2019 | To Time | Providing Conductor Driving Services for PetroGulf Misr Drilling Activities |
10 | Petrosilah | Filtration System | 21/11/2019 | To Time | Providing filtration system for Petrosilah wells |
11 | Abu Qir | Coiled tubing & Nitrogen | 18/12/209 | To Time | Providing coiled tubing & nitrogen services |
12 | GPC | Drilling Jars & Shock Sub Services | 14/01/2020 | To Time | Providing Drilling Jars & Shock Sub Services to serve GPC activities |
13 | GUPCO | The provision of Double acting hydraulic jar, accelerator and shock sub services | 15/04/2020 | To Time | Providing The provision of Double acting hydraulic jar, accelerator and shock sub services |
14 | Petrobel | Gravel Pack /Expandable sand control and hydraulic fracturing (Equipment products, filtration & pumping services) for all areas on Petrobel on call out basis | 22/05/2020 | To Time | Providing Gravel Pack /Expandable sand control and hydraulic fracturing (Equipment products, filtration & pumping services) for all areas on Petrobel on call out basis |
15 | SUCO | Memory Corrosion Log | 30/12/2018 | To Time | Providing SUCO with the required services |